Sunday, June 2, 2013

Getting Closer

We have been very busy at the house, so I have not had much time to update the blog.  I will go over some of the highlights, because there is too much to show in one blog.

For starters, the entire house is plastered and trimmed out, ready to paint. We also installed all of the tile in the house. Here is the tile that we used in the entrance area (hallway, pantry, mud room).  We also used the same for the laundry room and the first floor bathroom.


We also tiled the master bathroom:

and the kid's bathroom in the hallway of the second floor:

I also finished the fireplaces in the main room and the office. I bricked the main, wood burning fireplace and the office fireplace with the bricks from around the house (i.e. bricks from the old fireplace, walkway, etc.).
Before

After 

Here is a picture of the office stove:

     We also had all of the wood floors sanded and refinished on the first floor.  The second was sanded, but I have to polyurethane the second floor by hand, because there is no real ceiling between the second and third floor, there is only the finished flooring and the barn board subfloor.  I was afraid that if the floor guys put a thick layer of poly on the floors upstairs, that it would drip through and ruin the exposed beams and ceiling on the first floor. So, I have to go back and do the second floor myself, that way I can do multiple, thin layers that won't drip through.  Here are some pictures of the first floor.

Before

After


The next couple of steps are all finished work steps like built-in cabinets, and paint.  The kitchen cabinets get delivered next week.  We are finally seeing the light at the end of a very long tunnel.

Tuesday, April 2, 2013

Insulation and Drywall

We decided to spray foam the entire house.  Here are a couple of pictures of the insulation.



While I was waiting for the drywall guys to start, I finished putting in and patching the flooring on the second floor.  Here is a before and after shot of the new spare bedroom.

Before

After
The drywall guys showed up and delivered the drywall through the windows.


The entire house was done in less than a week.  Here are a couple pictures.







The house has been plastered as well, but I only have one good picture.  More to come....


Friday, February 22, 2013

It's Been a While....

It has been a while since my last post, so I am just going to post a bunch of pictures and list a few of the projects we have done in the last couple of months.  On the outside of the house, we have finished the septic system and the new side entrance.


With the septic in place, we were able to install the granite steps at the side entrance.  First the steps,


then the columns and trim,


and then the new door.


 There are too many projects to list on the interior of the house.  One major change was the restructuring of the doorway between the kitchen and the rest of the house. We had to remove the old LVL and support the doorway with an old beam, sured up with a new post.


The only thing left was to finish the framing for the rest of the wall.


Another big step was to install all three of the fireplaces, and finish the spaces in the center of the house.  Here is a picture of the main, wood burning fireplace in the center of the house.


Here is the gas stove in the office.


Here is the gas fireplace in the living room.


We had to run the chimneys through the second floor and up to the attic and then out the roof.  The chimneys run through Ami's closet, but they did not take up as much room as we thought.  We even had enough room for a linen closet.  Here is a picture.


The chimneys also went through the attic space and cut into the open third floor a bit.


One of the last jobs was to go around the house and build out all of the soffits around the plumbing and HVAC.  Here is a picture of the soffit on the first floor, hiding all of the plumbing from upstairs.


With all of the framing done, and all of the plumbing and electrical work roughed in, we were able to call for all of our inspections.  We passed all of our inspections including the final structural inspection. Next step is insulation and then drywall.










Wednesday, October 10, 2012

Approved!

    We finished up the framing and the subcontractors started roughing in the plumbing and the electrical.  We started to design our septic field and well system, when our engineer asked me about the fire hydrants on our street.  I told him that everyone in our neighborhood has wells, and that the town of Sharon does not have water service on our section of Bay Rd.  Turns out, since our road is the town line between Sharon and Stoughton (our house is in Sharon, but across the street is the town of Stoughton), the town of Stoughton put a waterline on the other side of the street when they worked on the road a couple of years ago so that they could add the fire hydrants.  I applied for a permit connect to Stoughton's water system and the permit was approved.
     This means, that we don't have to dig a new well or deal with the pump system.  Also, when you have a well, you have a lot of restrictions about how close you can put a septic system to that well, thus limiting the places that we could put the septic.  Now, we can put the septic anywhere that the ground perks, so its time to call the excavator.


     We dug two holes on the opposite side of the driveway from the house, and sure enough the soil was nice and sandy just like the soil behind the house. Here is a video of the guys digging the pits for the tests.


  We passed the test , so now we can design the septic system and get the water connected before it gets too cold.


Saturday, August 11, 2012

Sandblasting!

     I had a couple of days before the sandblasters could do their work, so I decided to finish the fireplace hearth in the office.  I need this hearth to be in place before the fireplaces can be installed.  Here is a picture of the hole in the floor in front of the fireplace.


     I framed in the opening and then roughed in the bricks.  I used bricks from the walkway to the front of the house.  The bricks look a bit older than new bricks would look, and we need to redo the front walk eventually anyway.


Here is the finished product.





     Not too bad for never having done any brick work before.  The fun part was buying a diamond tip blade for my chop saw, so that I could cut the bricks to any angle I needed.  

     Next, I needed to get all of the old and new wood out of the barn and onto the driveway, so that they could be sandblasted.  With the offer of free beer, I was able to get a big group of friends to help me haul all of the heavy wood.  Thanks to everyone that helped!  


     The sandblasters showed up two days later and blasted all of the beams and the ceiling on the first floor as well as most of the old wood in the barn.  The sandblasting made all of the wood look more uniformed in tone and texture, but it did make the wood look a little pitted and rough, and the color of wood looks a lot lighter and yellowish.  




Here is a picture of Roger blasting the beams in the driveway.

 
     I talked to our painter and he thinks that once we put a couple layers of polyurethane on the wood, it should all look a little darker and smoother.  I now need to install all of the new beams between the old joists on the entire first floor.  First, I had to paint all of the angle irons that are going to hold up the new beams.



     The beams are oak and they are very heavy.  I built a dead-man to rest the beam on, so that I could wedge some shims in under the beams to hold them in place and then bolt the angle irons on to the ends to hold the beams in place.  I was able to get about ten of them done on my own.  Here is a picture.

 
     It was really hard to lift the beams up over my head, and these were the smallest of the beams on the first floor.  Plus, there are over 50 of them.  I was trying to figure out a way to hoist the beams into place without killing myself and keep them there long enough to bolt them.  I just ordered a drywall lift, that is used to lift full sheets of dryway up to an 11 foot ceiling.  Hopefully, this will work, fingers crossed.



Sunday, July 22, 2012

Preparing for the Sandblaster

When we bought the house there was a drop ceiling on the first floor.  We removed the drop ceiling to reveal beautiful oak beams and joists holding up an old barn board ceiling.  Now that we have fixed most of the structural problems with the house, we are cleaning up all of the problems with the finished ceiling on the first floor so that we can sandblast all of the beams and the ceiling.  One section of the ceiling had been repaired and patched in the 70's.  Since there was a drop ceiling at the time, the owners were not overly concerned with the looks of the repairs because they were not visible.  As I started to fix all of the little problems with this section, I realized it would probably be easier to remove all of the floor boards and fix the entire section.  Here is a picture of the ceiling with the floor boards removed:



Here is the floor from above:



I ended up removing about 100 square feet of mostly new (i.e. from the 70s) floor boards. I was able to fix some other problems that were causing huge slopes and inconsistancies in the floor on the second floor.  
I needed to replace the boards, but I didn't want to use any of the big boards that I have saved so far in the renovation because I need them for the finished floor.  Long story short, I tracked down someone who had some boards from an old barn that had been demolished in upstate New York.  I drove an hour from our house to some old, rundown factory in Oxford, MA where this guy was storing the lumber.  It actually looked great, so I picked out a bunch of boards and loaded them on the my trusty Subaru.




I spent the next day or two replacing the floor boards and I think it came out great. Here is a picture from below.


Here is a picture from the second floor.


Next step is to call the sandblaster on Monday and schedule some blasting!