Wednesday, March 14, 2012

Office and Attic

I have been working on the attic for the last couple of days. I had to replace the ceiling joists with new lumber. We raised the ceiling up from about 7 feet to 8 feet. I had to put the new jousts in before I pulled the old joists out. The first picture shows the new joists installed but a couple of the old ones still there, ready to be removed.
The second picture shows the office space with the old plaster in the ceiling removed. The ceiling looks great and is ready for the sand blaster.

No comments:

Post a Comment