The crew finished the siding on the entire outside of the house. Here are a couple of pictures:
I also picked up the new window to replace the window that was above the front door:
I also had someone come in while the siders were working and had him finish the basement. He had to pour a slab over the gravel floor in the new addition, a step up from the new addition to the old part of the basement. and while he was there he pored a new floor in the small room where the electrical panel is located. I just realized I never actually took any pictures of the basement.
With the outside of the house just about done, and the basement floor finished, the focus turns now to the first floor. I started cleaning out all of the nails and random crap nailed to the ceiling over the years so that the sand blaster can come in and clean the ceiling beams and all of the posts. Once the sand blaster is done we can put up the new beams in between the old beams and finish the first floor.
No comments:
Post a Comment